Woodward 5501-470 12-slot Chassis Rack

5501-470

Technical parameters:

◆High Capacity On-Board DDR Memory: 128-256Mbyte
◆Support Disk On Chip 2-256M electronic discs
◆Support Windows XP, XPE, WINCE6.0, and Linux.
◆ Standard parallel port, 2 serial ports, 2 USB ports
◆ Provide IDE hard disc drive interface on the board

Categories: ,
Get a quote, please contact me immediately:
Simon Zhang
dcsplcsales@gmail.com
Phone/Whatsapp/Skype/Wechat: +86 133 6590 9307

Description

Woodward 5501-470 12-slot Chassis Rack


Personnel, departments, organizations, or other units responsible for executing and reviewing each stage of the SIS safety lifecycle should be identified, and their assigned responsibilities should be informed. Individuals, departments, or organizations involved in SIS safety lifecycle activities should have the ability to carry out the activities they are responsible for. The following issues should be addressed and documented: engineering knowledge, training, and experience suitable for process applications; Engineering knowledge, training, and experience suitable for sensors and final components; Knowledge of safety system engineering (such as process safety analysis); Understand legal and regulatory functional safety requirements; Having sufficient management and leadership skills that are appropriate to their role in the SIS security lifecycle activities; Understand the potential consequences of the event; Detailed information on the security integrity level of the deployed security instrumentation functions in the project. The complexity of applications and technologies. Procedures should be established to manage the capabilities of all personnel involved in the SIS lifecycle. Regular evaluations should be conducted to document an individual’s ability to respond to ongoing activities and changes within their role.

5501-470 may develop a safety plan to identify activities that need to be carried out in conjunction with individuals, departments, organizations, or other units responsible for carrying out these activities. This plan should be updated as needed throughout the entire SIS safety lifecycle and executed to a detailed level of activity that is commensurate with the role played by individuals or organizations in the Safety Instrumented System (SIS) safety lifecycle. The security system will account for 1-2% of the total installation cost of any project, thus receiving the least attention. Dealing with this issue is the main responsibility of project management. The security system installation plan should be properly incorporated into the entire project schedule. The safety instrumented system should undergo thorough testing and debugging, and therefore must meet all the requirements specified in the Safety Requirements Specification (SRS), and be approved at different levels before installation and debugging. All these timelines will be incorporated into the overall project plan. Developing safety design requirements in the early stages of a project can avoid modifications at the end of the project schedule. This may require additional budget/technology and well-trained resources and time.