Honeywell CC-TDOD51 do 24V

-12VDC, PNP and NPN logic (using external power supply)
-24VDC, PNP and NPN logic (using external power supply)
-Input impedance: 1.5k Ω
-Response time: ≤ 9ms
Two programmable relay outputs:
-Breaking voltage: 12~250 V AC/30 V DC
-Continuous current: 10 mA~2 A
Serial communication capability: 8

Category:
Get a quote, please contact me immediately:
Simon Zhang
dcsplcsales@gmail.com
Phone/Whatsapp/Skype/Wechat: +86 133 6590 9307

Description

Honeywell CC-TDOD51 do 24V
Honeywell CC-TDOD51 do 24V
The benefit sharing model (contract energy management) can be summarized as follows:
Joint investment, benefit sharing, and risk sharing.
Built on mutual trust and interdependence (co operation)
Which device to start with for feasibility study (preliminary on-site research)
Both parties jointly calculate and determine the benchmark, and agree on the sharing ratio.
Honeywell and Binhua Group both participate in the project from the perspective of investors, and both parties send the best and most capable personnel to plan and implement the project, which ensures the progress and quality of the project. In terms of subsequent maintenance, especially in the early stage when the engineers of Binhua Group have not fully mastered, Honeywell will also proactively send engineers to the factory to understand the operation situation, carry out controller maintenance, and inquire about any other problems that need to be solved. This is conducive to fully utilizing the control efficiency of APC and achieving a win-win situation.
The contract energy management project between Honeywell and Shandong Binhua is the first time that Binhua has implemented an advanced control project. Through joint efforts and collaboration, both parties have achieved a win-win situation. Binhua Group has decided to continue cooperating with Honeywell on the following three sets of devices, and the contract has been signed.