Sale!

GE VMIVME-017614-132/350-017614-132 D module

 

Place of shippingment: XIAMEN

Status: Brand new

Color: Green/Black/white

Size:240*250*55mm

Power supply: 220 VDC

Frequency: 1000

quantity:20
service: one year warranty

Payment: T/T

Delivery time: 3 days

 

 

Category:
Get a quote, please contact me immediately:
Simon Zhang
dcsplcsales@gmail.com
Phone/Whatsapp/Skype/Wechat: +86 133 6590 9307

Description

GE VMIVME-017614-132/350-017614-132 D module

GE VMIVME-017614-132/350-017614-132 D module

Nanjing is a famous ancient capital, a famous historical and cultural city, and the capital of Jiangsu Province. With prosperous economy, advanced culture, education, science and technology, and beautiful environment, it is located at the junction of the Yangtze River and the Beijing–Shanghai railway, and is a transportation hub in East China. The urban area is 947.3 square kilometers, with a current population of 2.68 million. Due to the small urban area of Nanjing, urban road traffic has been in a tense state for a long time.
Phase I of Nanjing Metro Line 1 starts from the Olympic Sports Center in the south and ends at Maigao Bridge in the north, forming a rapid transit corridor along the central axis of the main urban area of Nanjing. The estimated investment for the project is approximately 8.5 billion yuan, with a total length of 21.72 kilometers. The construction began in December 2000 and was officially put into operation on September 3, 2005. The south extension line of Nanjing Metro Line 1 starts from Andemen station, goes south via Tianlongsi station, Ningnan Daidō Station, etc., and finally arrives at China Yaoda Station, with a total length of 24.47km. There will be 15 stations along the line. It started construction in 2006 and was put into operation on May 28, 2010.
Phase I of Nanjing Metro Line 2 starts from Youfang Bridge in the west and ends at Maqun in the east, with a total length of 25.14km. There are 19 stations. Line 2 passes through Xinjiekou, Ming Palace of the Ming Dynasty, Xiaolingwei, Maqun, Hanzhong Gate, Mochou Lake, Hexi and other important areas along the way. Line 2 will intersect with Line 1 at Xinjiekou and Yuantong stations. At the intersection station, transfer within the station will be adopted, so that transferring from Line 1 to Line 2 does not require exiting the station to purchase a new ticket. Nanjing Metro Line 2 was fully started in December 2005 and put into operation on May 28, 2010.

TP854 3BSE025349R1
KUC720AE01
3BHB003431R0001
3BHB000652R0001
3BSE025349R1
3BSE030220R1 CI854A
3BSE030220R1
TVOC-2-240 1SFA664001R1001
TVOC-2-240
1SFA664001R1001
AX722F 3BDH000377R0001
AX722F
3BDH000377R0001
SDCS-AMC-CLAS2
GJR5252300R3101 07AC91H
07AC91H
TB711F 3BDH000365R0001
TB711F
3BDH000365R0001
PM783F 3BDH000364R0001
3BDH000364R0001
CM772F 3BDH000368R0001
CM772F
3BDH000368R0001
PFTL101A-2.0KN 3BSE004172R1
PFTL101A-2.0KN
TU715F 3BDH000378R0001
TU715F
3BDH000378R0001
DC732F 3BDH000375R0001
DC732F
3BDH000375R0001
TTH300
UNS3670A-Z V2 HIEE205011R0002
UNS3670A-Z V2
RC527 3BSE008154R1
RC527
3BSE008154R1
5SHY5055L0002
3BHE019719R0101
CI532V05 3BSE007297R1
CI532V05
3BSE007297R1
REF615CE HCFDACADABC2BAN11E
REF615CE
HCFDACADABC2BAN11E
TK803V018 3BSC950130R1
TK803V018
3BSC950130R1
REF615EE HBFHAEAGNCA1BNN1XE
REF615EE
HBFHAEAGNCA1BNN1XE
TP830 3BSE018114R1
UNITROL 1020
UNS0119A-ZV1
3BHE030579R0003
DSAI146 3BSE007949R1
DSAI146
3BSE007949R1
LC-608
RF522 3BSE000743R1
RF522
3BSE000743R1

 

 

Additional information

Weight 1.5 kg
Dimensions 350 × 350 × 28 cm