Description
GE IS200PMCIH1ABA Analogue Input Cards
The same programme running in the main PLC of the GE IS200PMCIH1ABA is also in standby, but not started. In addition, there is no communication cable connected to it. Therefore, it can be considered as a standby PLC, waiting to be put into operation in case the main PLC fails. As long as you need a backup system when the primary system fails. Remember, immediately put the primary system back into operation and either repair it or replace it. Once the primary system is back up and running again, when the backup system fails, the primary system will take over again and the cycle repeats.