C2G170-24 P0973BL SCADA control system

  • I/O NODE up to 16/control station
    8 I/O modules/NODE
    Maximum practical installation of 4096 DI/O points
    The operating station (XOS) can reach up to 16 stations
    Database Station (XDS) 1 Station Duplication
Category:
Get a quote, please contact me immediately:
Simon Zhang
dcsplcsales@gmail.com
Phone/Whatsapp/Skype/Wechat: +86 133 6590 9307

Description

C2G170-24 P0973BL SCADA control system

C2G170-24 P0973BL SCADA control system

With the rapid development of the industrial internet, PLC/DCS/SCADA control products have been applied by major enterprises. How to choose a PLC/DCS/SCADA control system has become a key issue for enterprises. After more than ten years of experience accumulation, Tiantuo Sifang has helped enterprises achieve perfect control system matching. Below, Tiantuo will share with you the differences and connections between Siemens PLC, DCS, and SCADA based on their previous experience.
Narrowly speaking, DCS is mainly used for process automation, PLC is mainly used for factory automation (production lines), and SCADA is mainly aimed at wide-area needs, such as oil fields and thousands of miles of pipelines. From the perspective of computers and networks, they are unified, and the main difference lies in the application requirements. DCS often requires advanced control algorithms, such as in the refining industry, where PLC has high processing speed requirements because it is often used in interlocking and even in fault safety systems; SCADA also has some special requirements, such as vibration monitoring, flow calculation, peak and valley regulation, etc. SCADA is the dispatch management layer, DCS is the station management layer, and PLC is the on-site equipment layer.