3ASC25H215E DATX131 Exploring the Main Content and Key Projects of LTE Terminal RF Testing

Abstract: With the rapid growth of wireless data services, the continuous introduction of new air interface technologies, and market competition from WiMAX, UMTS faces challenges in supporting real-time data services and large data volume services, and needs to evolve continuously. LTE has the characteristics of flexible spectrum usage, seamless interoperability with existing technologies, and low

3ASC25H204 DAPU100 NFC technical specifications and testing requirements

Non contact point-to-point data transmission (within ten centimeters) between electronic devices for data exchange. This technology evolved from contactless radio frequency identification (RFID) and is backward compatible with RFID, mainly used for providing M2M (Machine to Machine) communication in handheld devices such as mobile phones. Due to the natural security of near-field communication, NFC technology

Construction specification requirements for grounding

1. The shell, instrument panel, cabinet, box, box, cable tray, protective tube, bracket, base, and other normally uncharged metal parts of electrical instruments that may carry dangerous voltage due to insulation damage should be protected and grounded. For local instruments, switches, etc. with a power supply voltage not exceeding 36V, protective grounding may not be

DCS system grounding method

1. Starting from firmware version V4.1, the S7-1200 CPU supports configuration control functions, making module configuration and installation more flexible. 2. Establish a dedicated and independent grounding network for the DCS system; 3. Set up a dedicated grounding network for DCS, which is connected to the electrical grounding network through a grounding wire. Due to

Detailed analysis of DCS system grounding

1、 Basic requirements for DCS system grounding DCS system grounding is to ensure that when there is a problem with the signal, power supply, or DCS system equipment entering the DCS system, the effective grounding system can withstand overload current and quickly introduce the overload current to the ground. The grounding system can provide a

Baikalai APROL (DCS) System and DCS Development Trends

1. Baikalai APROL (DCS) System 1.1 APROL Historical Review The Baikalai APROL process control system is a highly integrated, integrated, modular, and modern concept process control system based on the LINUX system platform. Since its launch in 1984, APROL has a 20 year history of application, covering process control industries such as petrochemicals, metallurgy, pharmaceuticals,