GE PMC422-LAM D2 Redundant system power module

GE PMC422-LAM D2

Long distance and large capacity transmission
·Reduce the risk of large-scale power outages
Renewable energy access
·Effective access to distributed power sources
·Users are more flexible and convenient

Category:
Get a quote, please contact me immediately:
Simon Zhang
dcsplcsales@gmail.com
Phone/Whatsapp/Skype/Wechat: +86 133 6590 9307

Description

GE PMC422-LAM D2 Redundant system power module

The literature indicates that the voltage drop in the secondary circuit of the 110 kVI voltage transformer in a certain power plant is 0.62%. The voltage drop of the secondary circuit of the 110kVI voltage transformer exceeds the standard, which directly affects the accurate measurement of the energy meter metering device at the gateway of generator 3. The average annual online electricity consumption of Unit 3 is 200 million kilowatt hours, with a loss of electricity of △ W=W * 0.62%=124000 kWh, which means an annual loss of electricity of 1.24 million kilowatt hours.
From the above examples, it can be seen that the secondary voltage drop of PT directly affects the accuracy of electrical energy measurement. Due to the unidirectional nature of the secondary voltage drop of PT, power companies miss the calculation of electrical energy, resulting in huge economic losses; At the same time, it is also a potential threat to the safe operation of the power system.
2、 Wiring form of secondary circuit of voltage transformer
During on-site operation, different wiring configurations were used for the secondary circuit of voltage transformers according to different voltage levels
Equation.

Main technical parameters:
Accuracy: ± 5% F? S
Alarm mode: digital display
Alarm sound: ≥ 70Db
Response time: ≤ 30S
Recovery time: ≤ 60S
Resolution: ± 1Ppm ± 1% LEL
Security level: Exd II Ct3
Measurement range: (0-100) PPm/(0-1000) PPm/(0-100)% LEL
Working environment: Temperature: -20 ℃~60 ℃
Humidity: ≤ 95% RH without frost formation
Charging voltage: 4.2-4.7V
Charging time: 8-12 hours

=====================================================================================================

FAQ:
1.How soon can we receive the goods?
We all have stock on hand and can support payment and delivery on the same day!

2.What payment methods are supported?
There are many ways(T/T….) for you to choose and You can choose anyone you want.

3.Is there any after-sales service?
Of course, if our goods are brand new, they are guaranteed for one year!

4.What express delivery is supported?
Support FedEx DHL Express International Shunfeng, etc.

5.How to keep in touch with you?
You can contact me 24 hours at any time through WeChat ,Skype , WHATSAPP, LINE and my email!
Thank you again for your consultation and wish you a happy life

=====================================================================================================

MORE YOU NEED

YOKOGAWA                SAI143-H63
YOKOGAWA                A1BA4D-05
ABB                REF543KM129AAAB
ABB                CI854AK01
GE                IC693TCM302
Baumuller        BUM61-20/30-54-B-O-12
ABB                CTB810,HN800
WOODWARD        5417-028
ELAU                MC-4/11/03/400
Mitsubishi                MELFA CR1-571
WATLOW ANAFAZE                997D-11CC-JURG
ABB                PFEA111-65 3BSE050091R65
PARKER                87-008145-03
ASM                4552200
MOLAND                203091-511B